|
The Gateway Express project is a planned toll road in Pinellas County, Florida. The project consists of two branches: an elevated highway to be designated State Road 690 (SR 690) above 118th Street North between Interstate 275 (I-275) and U.S. Highway 19 (US 19) and a raised highway in the median of SR 686 from 118th Street to the Bayside Bridge. Construction was approved in February 2014 and is expected to begin in 2017, taking five years to complete. == Route description == The Gateway Express project consists of two connected segments. A four-lane, elevated segment will run above 118th Avenue from US 19 to I-275. This section will be designated SR 690. A raised, four lane expressway will be built in the median of SR 686 and carry the same designation. This segment will run from the planned SR 690 segment north to the Bayside Bridge and connect to St. Petersburg–Clearwater International Airport. Both segments will be tolled using electronic toll gantries for SunPass transponders or pay-by-plate billing. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Gateway Express」の詳細全文を読む スポンサード リンク
|